Skip to product information
1 of 1

A393 Momentary Push Button Switch with Long Leads – Normally Open (NO) Tactile Switch

A393 Momentary Push Button Switch with Long Leads – Normally Open (NO) Tactile Switch

SKU:

Regular price Rs. 10.00
Regular price Sale price Rs. 10.00
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity
View full details
Secure checkoutSafe payment options
Pan-India deliveryDelivered across India
Expert supportHelp when you need it

SLV INDIA / PRODUCT OVERVIEW

Product overview

The Momentary Push Button Switch with Long Leads is a compact and reliable tactile switch designed for a wide range of electronic and DIY applications. Featuring extended metal legs for easy installation and flexible mounting, this switch is ideal for projects requiring custom positioning or direct wiring.

This switch operates in a momentary (normally open) mode, meaning the circuit is only completed when the button is pressed and returns to its original state when released. Its durable construction ensures consistent performance and long operational life.

Perfect for use in electronic circuits, control panels, prototyping boards, and repair work, this push button switch offers a dependable solution for temporary input control.


Key Features:

  • Type: Momentary Push Button (Normally Open)
  • Leads: Long metal leads for easy soldering and mounting
  • Operation: Press to connect, release to disconnect
  • Compact Design: Space-saving and lightweight
  • Durable Build: Designed for repeated use
  • Easy Installation: Suitable for through-hole and custom setups

Applications:

  • DIY electronics projects
  • Arduino & microcontroller circuits
  • Reset and control buttons
  • Prototyping and testing boards
  • Consumer electronics repair

Package Includes:

  • 1 × Momentary Push Button Switch (Long Lead Type)

Explore every detail